Special Offer
STYLISH SUIT
Lorem impsum.
Urgent
TRENDY SKIRT
ship management
Double Hull, Double Bottom Built in 2006
LOA: 81.65m
Length: 75.70m Breadth: 12.00m Depth: 5.60m
Laden Draft: 4.600m
Laden Water Displacement: 3295.600Ton
Reference Cargo Oil Capacity: 2220Ton
Location Of Double Bottom: FR7-FR116
Operation Area: A1+A2
Class: ZC
Main Engine: G6300ZCA, 735kW@500rpm, Ningbo CSI
Gensets: 51.5kW*1, 40kW*1
Boiler: Fuel Oil Heating&Others, 250kg/h, 36.00m2, Wuxi Weilite Boiler Company
Cargo Pump: 2NOs, 350 M3/HR, 400 M3/HR
Gross Tonnage: 1574
Net Tonnage: 881 Life Boat: 6ppl * 1NO Lift Raft: 15ppl*1
12 Cargo Tanks, are constructed with stainless steel “SUS 304 L” materials.
Last DD: Sept 24, 2024
Next DD: Sept 24, 2027
Next SS: June 30, 2026
Oil Chemical Tanker-2220Ton-2006
For SaleAdd to FavouritesDescription
Double Hull, Double Bottom Built in 2006
LOA: 81.65m
Length: 75.70m Breadth: 12.00m Depth: 5.60m
Laden Draft: 4.600m
Laden Water Displacement: 3295.600Ton
Reference Cargo Oil Capacity: 2220Ton
Location Of Double Bottom: FR7-FR116
Operation Area: A1+A2
Class: ZC
Main Engine: G6300ZCA, 735kW@500rpm, Ningbo CSI
Gensets: 51.5kW*1, 40kW*1
Boiler: Fuel Oil Heating&Others, 250kg/h, 36.00m2, Wuxi Weilite Boiler Company
Cargo Pump: 2NOs, 350 M3/HR, 400 M3/HR
Gross Tonnage: 1574
Net Tonnage: 881 Life Boat: 6ppl * 1NO Lift Raft: 15ppl*1
12 Cargo Tanks, are constructed with stainless steel “SUS 304 L” materials.
Last DD: Sept 24, 2024
Next DD: Sept 24, 2027
Next SS: June 30, 2026
Advert details
Comments
Rating
Users' reviews
Log-in to add review